On new commercial and public works construction, the acceptance CCTV run is the last thing standing between you and closeout. A failed inspection means re-cleaning, remobilizing and sometimes excavating a line you already backfilled. Most failures are preventable with the right sequence.
Common reasons new lines fail acceptance
- Construction debris: rock, grout, mud and stray material left in the line
- Sags and standing water from bedding or compaction issues
- Joint offsets or gaps from settlement during backfill
- Protruding or poorly made service taps
- Deformed flexible pipe beyond allowed limits
- Unclean lines that hide defects and force a re-run
Sequence that passes the first time
- Confirm the owner or municipality's spec: PACP, deflection testing, footage tolerances, report format
- Jet and vacuum the line before the camera so the reviewer can see the pipe wall
- Run the camera before final paving where practical
- Review footage with your superintendent before submitting
- Fix and re-inspect only the failed segments
Inspect before paving, not after
A pre-paving camera run costs a fraction of saw-cutting finished concrete or asphalt to reach a damaged line. Many contractors schedule an internal check after backfill and a formal acceptance run once the site is stable.
What the reviewer wants to see
A clean, well-lit video with a working footage counter, accurate header data, coded observations and still images at every finding. Lines should be flushed so water levels are low enough to see the invert. A report that cannot be reviewed is a report that gets rejected.
Acceptance inspection FAQ
- Should the line be cleaned before an acceptance inspection?
- Yes. Debris and standing water hide defects and are a common reason reviewers reject footage.
- Can you inspect storm lines and box culverts too?
- Yes. CSC inspects sanitary, storm and culvert infrastructure for commercial and municipal acceptance.
- How fast do we get the report?
- Turnaround depends on footage and coding scope. Ask for a timeline when you request a quote so it fits your closeout schedule.
