Transparent Project Pricing
Firm, itemized pricing - no vague hourly ranges.
Cavayoo Services prices every job by scope so contractors, engineers and municipal owners can put a real number in a bid or budget. Send plans, an address or a scope description and we return a written quote - usually the same business day.
How we price
What drives the number on your quote
Scope & footage
Line diameter, footage, number of structures, cleaning requirements and how much of the site we can access in one setup.
Deliverables
Video only, still images, NASSCO-based defect logs, engineer-ready reports - deliverable format affects on-site time and post-processing.
Access & site conditions
Manhole and cleanout access, traffic control, confined-space setup, and whether pre-cleaning is needed before CCTV or locating.
Schedule
Standard business hours vs. after-hours, weekend or rush emergency dispatch. All uplifts are stated on the written quote.
Mobilization
Distance from our Cedar Park, TX yard within our 100-mile service radius, plus any specialty equipment mobilization.
Bundling
CCTV + jetting or potholing + locating combined into a single mobilization is priced lower than each service individually.
Pricing by service
How each service is priced
CCTV Pipeline Inspection
Priced by project scope
Priced by footage, pipe size, access, cleaning requirements and reporting format. Send plans and specs for a project-specific quote.
Commercial Vacuum Truck Services
Priced by project scope
Priced by material type, volume, access, disposal and mobilization. Rush and after-hours available. All disposal subject to material classification and approved facilities.
Sewer & Storm Line Cleaning
Priced by project scope
Priced by footage, line diameter, blockage severity and material to remove. Bundled pricing available with CCTV inspection.
Hydro Excavation & Potholing
Priced by project scope
Priced by number of potholes, depth, soil conditions, disposal and access. Ask about SUE Level A test hole packages.
Utility Line Locating
Priced by project scope
Priced by site size, number of lines and accessibility. Bundled pricing available with hydro-potholing.
What's in the quote
Every written quote includes
- ✓Itemized scope, line diameter and footage
- ✓Deliverables (video, stills, defect log, NASSCO report)
- ✓Estimated on-site time and crew size
- ✓Mobilization from our Cedar Park, TX yard
- ✓Any after-hours, weekend or rush uplifts - stated up front
- ✓Change-order pricing: extra work is quoted before we do it
Pricing FAQ
Common pricing questions
How much does a CCTV pipe inspection cost in Austin, TX?
Do you charge by the hour or by the project?
Are there minimums or trip charges?
Do you offer bundled pricing for CCTV + jetting or CCTV + potholing?
What is included in a written quote?
How fast can I get pricing back?
Do you serve outside Austin?
How do I request project pricing?
Ready for a firm number?
Send scope - we'll return a written, itemized quote, usually the same business day.