Austin, TX case study · January 2026

Grease-choked 6-inch main serving a downtown Austin food hall

Commercial property manager · Multi-tenant food hall, Downtown Austin · Sewer Jetting & CCTV Verification

Sewer camera view of the same downtown Austin grease line restored to full diameter with clean pipe walls after CSC Pipe Inspection hydro jetting
Sewer camera view of a downtown Austin commercial grease line narrowed to a fraction of its diameter by hardened grease before hydro jetting
BeforeAfter

Drag the divider to compare. Before: Sewer camera view of a downtown Austin commercial grease line narrowed to a fraction of its diameter by hardened grease before hydro jetting After: Sewer camera view of the same downtown Austin grease line restored to full diameter with clean pipe walls after CSC Pipe Inspection hydro jetting

Line restored to
100 pct diameter
Work window
Overnight
Tenants disrupted
0
Emergency calls since
0

The problem on this Austin site

Six kitchen tenants shared one 6-inch cast iron main under the slab. Backups were hitting the two tenants furthest downstream about every ten days, and the property manager was absorbing after-hours emergency calls with no evidence of who or what was causing it.

How our NASSCO-certified crew approached it

  1. Scoped the 6-inch main first to separate a maintenance problem from a structural one before any jetting was quoted
  2. Ran warthog and chain-free nozzles overnight from downstream to upstream so grease was carried out, not packed forward
  3. Cleared the interceptor discharge line in the same window so the main would not reload
  4. Re-scoped the full run on camera before opening and issued footage-marked video tied to each tenant tie-in

What the camera documented

  • Hardened grease reducing the main to roughly 25 percent of its design diameter across a 40 ft run
  • Grease loading concentrated downstream of two specific tenant tie-ins, documented on video with footage marks
  • No structural defects in the cast iron - the failure was maintenance, not pipe condition
  • Interceptor discharge line partially blocked, feeding the problem back into the main

Measurable results

  • Hydro-jetted back to full diameter overnight, with a verification scope run before the first tenant opened
  • Footage-marked video gave the property manager tenant-specific evidence for the grease policy conversation
  • Quarterly jetting and scope schedule put in place; no emergency backups reported since

Need this on your Austin project?

CSC Pipe Inspection runs commercial CCTV, jetting, hydro excavation and line locating across Austin and Central Texas with 25+ years of field experience and NASSCO/PACP-coded reporting.

More documented jobs

Call NowGet Quote