2026-11-01 · 7 min read

NASSCO PACP Coding Explained for Contractors and Engineers

What PACP defect codes and condition grades mean, how to read them in a CCTV report, and why public works and engineers ask for them.

NASSCO PACP Coding Explained for Contractors and Engineers field guide

PACP, the Pipeline Assessment Certification Program from NASSCO, gives everyone reviewing a sewer inspection the same vocabulary. Instead of an operator writing "bad crack near the middle," a PACP report records the defect type, its exact footage and a severity grade. Engineers, public works reviewers and owners can compare segments, prioritize repairs and defend budgets with consistent data.

Structural versus operational defects

PACP separates defects into two families. Structural defects describe the pipe itself: cracks, fractures, breaks, deformation, joint offsets and surface damage. Operational and maintenance defects describe what is in or affecting the pipe: roots, grease, deposits, obstacles and infiltration. The split matters because structural findings usually lead to rehabilitation or repair, while operational findings usually lead to cleaning and a maintenance interval.

How condition grades work

Each observation receives a grade from 1 to 5. Grade 1 is a minor defect, and grade 5 indicates a defect that has failed or will likely fail soon. Segment ratings and quick ratings summarize those grades so a reviewer can scan a long inspection and immediately see which segments need attention first.

  • Grade 1: minor, little immediate concern
  • Grade 2: minor with potential to worsen over time
  • Grade 3: moderate, plan monitoring or work
  • Grade 4: significant, likely to fail in the near term
  • Grade 5: failed or imminent failure, act now

When to require PACP on your project

Require PACP coding for municipal acceptance, engineering condition assessments, rehabilitation design, capital planning and any job where the report will be reviewed by someone who was not on site. For a simple blockage diagnosis on a commercial lateral, a clear video and summary may be enough. Tell your inspection contractor the purpose of the work up front so the deliverable matches.

What a usable PACP deliverable includes

  • Header data: location, upstream and downstream access, pipe size, material, direction
  • Every observation with footage, PACP code and grade
  • Still images at each coded defect
  • Full recorded video tied to the report
  • Segment and quick ratings for prioritization

PACP FAQ

Is PACP required for every sewer inspection?
No. It is typically required for municipal, engineering and capital-planning work. Commercial diagnostic jobs can use a simpler report if the owner agrees.
Who can produce a PACP report?
An operator holding current NASSCO PACP certification using software that records PACP-compliant data.
Can PACP data be imported into asset management systems?
Yes. PACP is designed as a standard data format so municipalities and engineers can import and compare inspections over time.

Have a project we can help with?

Call CSCRequest Pricing