Cedar Park, TX case study · April 2026

Pre-backfill scope caught crushed PVC on a Cedar Park build

General contractor · Retail pad site, Cedar Park near Ranch at Brushy Creek · New Construction Sewer Verification

Sewer camera view of the same Cedar Park new construction sewer run after repair and flushing, showing clean PVC at consistent grade
Sewer camera view inside new PVC pipe on a Cedar Park construction site showing gravel debris and a crushed section holding water before backfill
BeforeAfter

Drag the divider to compare. Before: Sewer camera view inside new PVC pipe on a Cedar Park construction site showing gravel debris and a crushed section holding water before backfill After: Sewer camera view of the same Cedar Park new construction sewer run after repair and flushing, showing clean PVC at consistent grade

Caught before
Backfill
Footage inspected
306 ft
Rework avoided
Asphalt cut
Schedule impact
None

The problem on this Cedar Park site

The site superintendent wanted underground verified before backfill and paving. The subcontractor had already pulled the trench boxes and was ready to bring in select fill the next morning, which would have buried anything wrong under a finished parking lot.

How our NASSCO-certified crew approached it

  1. Scheduled the scope in the window between pipe installation and select fill, with trench boxes already pulled
  2. Ran every new sanitary run end to end, checking grade, deflection, joint seating, and cleanout elevations
  3. Flagged the crushed section on the spot so the site super could turn the sub around the same day
  4. Flushed the debris and re-scoped clean, then packaged the signed video for the City closeout submittal

What the camera documented

  • Crushed section of 6-inch SDR-35 PVC at 74 ft where a loaded truck had tracked across an unshored trench
  • Gravel and mortar debris left in three runs, enough to catch solids at startup
  • One cleanout stubbed at the wrong elevation relative to the invert
  • Grade verified acceptable everywhere else on the run

Measurable results

  • Damage found while the trench was still open, so the fix was a same-day pipe swap instead of saw-cutting new asphalt
  • Debris flushed and re-scoped clean before the fill was placed
  • Signed-off video and report went into the closeout package the City accepted at final