Georgetown, TX case study · December 2025

Manhole inflow survey that cut wet-weather flow in Georgetown

Municipal / public works · Collection system basin, older Georgetown neighborhood mains · MACP Manhole & CCTV Inspection

Interior of the same Georgetown manhole after rehabilitation, showing a fresh cementitious liner, dry walls, and a clean bench and channel
Interior of a deteriorated Georgetown sanitary sewer manhole with corroded bench, exposed aggregate, and active infiltration running down the wall
BeforeAfter

Drag the divider to compare. Before: Interior of a deteriorated Georgetown sanitary sewer manhole with corroded bench, exposed aggregate, and active infiltration running down the wall After: Interior of the same Georgetown manhole after rehabilitation, showing a fresh cementitious liner, dry walls, and a clean bench and channel

Structures inspected
34
Active inflow found
9
Coding standard
NASSCO MACP
Budget redirected
To rehab

The problem on this Georgetown site

Wet-weather flows at the lift station were spiking well past dry-weather baseline after every significant rain. Staff knew the basin had inflow and infiltration but had no defensible data on which structures were responsible, and the rehab budget only covered a fraction of the basin.

How our NASSCO-certified crew approached it

  1. Surveyed all 34 structures in the basin to NASSCO MACP with photo documentation at each level
  2. Scoped the connecting mains so pipe condition and structure condition were rated separately
  3. Scored and ranked every structure so staff could spend the rehab budget worst-first instead of by guess
  4. Re-inspected after rehabilitation and delivered the before and after record for the compliance file

What the camera documented

  • Active infiltration through the chimney and cone on 9 of 34 structures inspected, MACP-coded and photographed
  • Deteriorated bench and channel with exposed aggregate in the oldest section of the basin
  • Two frames seated on failed mortar, taking direct surface inflow through the ring
  • Upstream mains largely sound, redirecting the budget away from pipe replacement

Measurable results

  • MACP condition ratings let staff rank all 34 structures and rehab the worst 9 first
  • Rehab dollars went to lining and grouting instead of open-cut main replacement that was not needed
  • Post-rehab re-inspection documented dry walls and clean channels for the compliance file