Bexar County

Universal City Pipe Inspection & Grease-Line Jetting

5.0· 3 verified Universal City reviews

Universal City is dense, built-out and full of multifamily, retail and food-service properties near Randolph. Recurring grease-line jetting, parking-lot storm CCTV and fast diagnostics on backups are the calls that come in here.

Common Universal City projects

  • Recurring multifamily and restaurant grease jetting
  • Parking-lot storm system CCTV
  • Rapid backup diagnostics
  • Interceptor and catch basin cleaning

Neighborhoods we work in

Pat Booker RoadKitty HawkRandolph areaAviation Boulevard

On-site in Universal City

Services available in Universal City

Every service below runs the same field-tested CSC process: locate, inspect on camera, document defects, and hand you a PACP-coded report before the crew leaves your Universal City property.

CSC Pipe Inspection crew running a pipe inspection process on a Universal City driveway

CCTV Pipeline Inspection in Universal City

High-resolution camera inspection of sanitary sewer, storm drain and underground utility systems.

Delivered on-site across Universal City and Bexar County with the same certified crew you'd get on any CSC cctv inspection job.

Commercial Vacuum Truck Services in Universal City

Two commercial vacuum trucks removing water, mud, sediment, sludge and non-hazardous debris on active construction and infrastructure projects.

Handles wet spoils, slurry, and non-hazardous liquids on Universal City sites without renting a separate truck.

Sewer & Storm Line Cleaning in Universal City

High-pressure jetting to remove sediment, grease, roots, concrete residue and construction debris from sanitary sewer and storm drainage.

Delivered on-site across Universal City and Bexar County with the same certified crew you'd get on any CSC line cleaning job.

Hydro Excavation & Potholing in Universal City

Safely expose underground utilities using pressurized water and vacuum equipment - daylighting, potholing and utility test holes.

Delivered on-site across Universal City and Bexar County with the same certified crew you'd get on any CSC hydro excavation job.

Utility Line Locating in Universal City

Locate and mark underground sewer, water, electrical and communication infrastructure before excavation, drilling or construction begins.

Delivered on-site across Universal City and Bexar County with the same certified crew you'd get on any CSC line locating job.

GCs, developers, property managers, and municipal crews in Universal City rely on CSC for the full pipeline stack. cctv inspection in Universal City, vac truck in Universal City, line cleaning in Universal City, hydro excavation in Universal City, and line locating in Universal City are dispatched from our Cedar Park yard, usually same-day within Bexar County County.

Why Universal City calls CSC

Local differentiators - not a national script

  • PACP-coded reports formatted the way Universal City GCs, municipal reviewers, and property managers actually want to receive them - no re-work.
  • Flat-rate pricing quoted in writing before we roll a truck to Universal City - no trip fees, no "diagnostic" surprises.
  • Fully insured for commercial and municipal work across Bexar County - COIs issued to your GC or property manager the same day.
  • Crews who already know Bexar County soils, permitting timelines, and the utility markouts you'll get back from 811 in Universal City.

How we work in Universal City

A predictable process, on every Bexar County job

  1. 1

    CCTV inspection

    Calibrated crawler travels the full line, with a live monitor you can watch. Common Bexar County issues like recurring multifamily and restaurant grease jetting get flagged in real time.

  2. 2

    PACP-coded report

    Every defect is coded to NASSCO PACP standards, mapped by footage from the cleanout, and delivered as a PDF plus the raw video - usually before we leave Universal City.

  3. 3

    Repair recommendations

    We hand the file to your GC or engineer with a plain-English summary of what's normal wear for Universal City commercial lines and what actually needs work.

  4. 4

    Hydro-excavation, if needed

    If a spot dig is warranted, our vacuum truck safely exposes the pipe without cracking utilities - critical near Pat Booker Road and any tree-root-heavy lot.

Recent work

Recent Universal City, TX project photos

A snapshot of recent commercial jobs our Universal City crews wrapped - real trucks, real crews, real deliverables.

Book your Universal City project →
CSC Pipe Inspection technicians reviewing a PACP-coded sewer inspection report on a tablet at a Universal City commercial job site near Aviation Boulevard
CCTV Pipeline Inspection

Same-day PACP report handoff in Universal City

Sewer camera inspection reporting in Universal City, TX - PACP-coded defect log and HD video delivered the same day.

Field review of a PACP-coded condition report with the superintendent on a Aviation Boulevard project. Defect log, footage marks, and HD video went to the GC before the crew left the site.

Site: Aviation Boulevard, Universal City
Scope
Field report handoff
Equipment
Tablet review, footage marks
Crew
Lead PACP operator
Deliverable
Defect log + HD video before demob
See CCTV Pipeline Inspection details →
CSC Pipe Inspection hydro-excavation truck daylighting utilities on a Universal City job site near Pat Booker Road, operator in branded shirt at the boom
Hydro Excavation & Potholing

Hydro-excavation daylighting in Universal City

Hydro excavation in Universal City, TX - non-destructive potholing to daylight utilities before a directional bore.

Non-destructive potholing for a utility tie-in near Pat Booker Road. Crew daylighted gas, water, and fiber before the GC's directional bore.

Site: Pat Booker Road, Universal City
Scope
6 potholes to 8 ft
Equipment
Vac truck, 3,000 PSI wand
Crew
2-person hydro crew
Deliverable
Marked depths + photo log
See Hydro Excavation & Potholing details →
CSC Pipe Inspection CCTV crawler monitor showing a defect inside a Universal City sewer lateral, operator reviewing PACP-coded footage
CCTV Pipeline Inspection

CCTV sewer inspection in Universal City

CCTV pipeline inspection in Universal City, TX - NASSCO PACP-coded video and same-day condition report.

NASSCO PACP-coded video inspection of a 6-inch lateral in Kitty Hawk. Delivered condition report with defect stationing the same day.

Site: Kitty Hawk, Universal City
Scope
6-inch lateral, 180 ft
Equipment
Self-leveling CCTV crawler
Crew
NASSCO PACP operator
Deliverable
Same-day PACP report + HD video
See CCTV Pipeline Inspection details →

Central Texas case studies

Sewer camera inspection case studies near Universal City, TX

We have not published a Universal City job yet, so these are the closest documented commercial inspections from our Central Texas service area. Each one is labeled with the city it was actually performed in. Same crews, same certifications, same reporting on your Universal City site.

Sewer camera inspection still from an East Austin commercial lateral showing an offset clay pipe joint and a longitudinal crack with soil infiltration
Before
Post-repair sewer camera inspection still of the same East Austin lateral showing a new PVC spot repair section with clean walls and restored flow
After
Austin, TXGeneral contractorMarch 2026

Offset clay joint under a live East Austin loading dock

Mixed-use retail shell, East Austin near Springdale · CCTV Pipeline Inspection

The problem

The GC was three weeks from turnover on a retail shell and the building sewer kept surcharging into the loading dock trench drain after every rain. Two prior contractors had rodded the line and called it clear. Nobody had put a camera on it, so nobody could tell the owner whether the problem was inside the building, in the private lateral, or in the City main.

Our approach

  1. Set up on the downstream cleanout and ran a self-leveling CCTV crawler upstream through the full building sewer, logging footage marks at every defect
  2. Coded each observation to NASSCO PACP so the structural calls could be defended to the owner and the City
  3. Sonde-located the offset joint and paint-marked the dig window on the dock slab
  4. Verified the City tap and downstream main so responsibility was settled before anyone priced a repair

What the camera found

  • Heavily offset joint at 61 ft with visible soil infiltration, coded PACP JOM/JOL
  • Longitudinal crack running roughly 4 ft upstream of the offset in 6-inch vitrified clay
  • Standing water measured at 22 percent of pipe diameter, confirming a sag rather than a blockage
  • City tap and downstream main verified clear, moving responsibility onto the private lateral

Measurable results

  • Defect sonde-located and paint-marked on the surface, so the repair crew dug one 8 ft pit instead of trenching the full run
  • PACP-coded report and HD video sent the same afternoon, which the owner's rep accepted without a second opinion
  • Post-repair re-scope documented a clean, correctly graded line and closed out the punch item before turnover
Footage inspected
184 ft
Defects coded
7
Report delivered
Same day
Excavation avoided
~120 ft
Sewer camera view of a downtown Austin commercial grease line narrowed to a fraction of its diameter by hardened grease before hydro jetting
Before
Sewer camera view of the same downtown Austin grease line restored to full diameter with clean pipe walls after CSC Pipe Inspection hydro jetting
After
Austin, TXCommercial property managerJanuary 2026

Grease-choked 6-inch main serving a downtown Austin food hall

Multi-tenant food hall, Downtown Austin · Sewer Jetting & CCTV Verification

The problem

Six kitchen tenants shared one 6-inch cast iron main under the slab. Backups were hitting the two tenants furthest downstream about every ten days, and the property manager was absorbing after-hours emergency calls with no evidence of who or what was causing it.

Our approach

  1. Scoped the 6-inch main first to separate a maintenance problem from a structural one before any jetting was quoted
  2. Ran warthog and chain-free nozzles overnight from downstream to upstream so grease was carried out, not packed forward
  3. Cleared the interceptor discharge line in the same window so the main would not reload
  4. Re-scoped the full run on camera before opening and issued footage-marked video tied to each tenant tie-in

What the camera found

  • Hardened grease reducing the main to roughly 25 percent of its design diameter across a 40 ft run
  • Grease loading concentrated downstream of two specific tenant tie-ins, documented on video with footage marks
  • No structural defects in the cast iron - the failure was maintenance, not pipe condition
  • Interceptor discharge line partially blocked, feeding the problem back into the main

Measurable results

  • Hydro-jetted back to full diameter overnight, with a verification scope run before the first tenant opened
  • Footage-marked video gave the property manager tenant-specific evidence for the grease policy conversation
  • Quarterly jetting and scope schedule put in place; no emergency backups reported since
Line restored to
100 pct diameter
Work window
Overnight
Tenants disrupted
0
Emergency calls since
0
Sewer camera inspection still from a Round Rock flex building showing a cracked and offset pipe joint flagged with PACP defect codes
Before
Re-inspection still of the same Round Rock sewer joint after spot repair, showing aligned pipe and a passing PACP condition rating
After
Round Rock, TXDeveloper / buyer due diligenceFebruary 2026

Pre-acquisition scope that repriced a Round Rock flex building

1980s flex industrial building, north Round Rock · Commercial Due Diligence Sewer Inspection

The problem

A buyer had 12 days left in the inspection period on a flex industrial building. The seller's disclosure said the underground was 'in service and functional.' The buyer's lender wanted a documented condition assessment on the sanitary and storm before funding.

Our approach

  1. Mobilized inside 48 hours of the buyer's call to fit the option period
  2. Inspected both the sanitary and the storm systems, structure to structure, on a single mobilization
  3. Graded every defect to PACP so the lender and the buyer's engineer had a common condition standard
  4. Issued the video, defect log, and a written scope of repair together so bids came back on the same basis

What the camera found

  • Cracked and offset joint at the property-line cleanout, coded as a Grade 4 structural defect
  • Two bellies in the sanitary run holding water, one deep enough to trap solids
  • Roof drain leader tied illegally into the sanitary line, a compliance exposure for the buyer
  • Storm line clear but silted, needing cleaning rather than replacement

Measurable results

  • PACP report and video delivered to the buyer's engineer inside 24 hours, in time for the option deadline
  • Buyer negotiated a repair credit against the purchase price using the coded defect grades as the basis
  • Scope of work for the spot repair and storm cleaning written straight off the defect log, so bids came back comparable
Footage inspected
412 ft
Turnaround
24 hours
Grade 4 defects
1
Closed on time
Yes
Companies we work with

Trusted by contractors serving Universal City & Bexar County County

These are real GCs, sitework crews, and municipalities we work with across Central Texas - including project work near Universal City.

  • Jimmy Evans Company logo - CSC Pipe Inspection partner
    Sitework Contractor
    Jimmy Evans Company
  • JL Gray Construction logo - CSC Pipe Inspection partner
    General Contractor
    JL Gray Construction
  • CLS Excavation Inc. logo - CSC Pipe Inspection partner
    Excavation
    CLS Excavation Inc.
  • Patin Construction logo - CSC Pipe Inspection partner
    Construction
    Patin Construction
  • City of Round Rock, TX logo - CSC Pipe Inspection partner
    Municipality
    City of Round Rock, TX
  • City ofAustinTexas
    Municipality
    City of Austin, TX
  • City ofCedar ParkTexas
    Municipality
    City of Cedar Park, TX
  • City ofGeorgetownTexas
    Municipality
    City of Georgetown, TX
  • City ofLeanderTexas
    Municipality
    City of Leander, TX
  • City ofPflugervilleTexas
    Municipality
    City of Pflugerville, TX
  • City ofHuttoTexas
    Municipality
    City of Hutto, TX
  • City ofKyleTexas
    Municipality
    City of Kyle, TX
  • City ofSan MarcosTexas
    Municipality
    City of San Marcos, TX

Verified Universal City customer reviews

Rated 5.0 / 5 by Universal City GCs, property managers, and public works crews

5.0 average · 3 verified Universal City reviews

First-party feedback from recent Universal City-area jobs. Names shortened for privacy; ratings reflect verified customer responses.

5 out of 5 stars
Showed up when they said they would, ran the camera the whole line, and sent us the video the same afternoon. Made the Universal City permit walk-through painless.
Michael
General Contractor, Universal City
CCTV Pipeline Inspection
5 out of 5 stars
We had a shallow gas line right where we needed to set piers. Their hydro crew potholed four spots in Universal City without a single hit. Worth every dollar.
Sarah
Project Manager, Universal City
Hydro-Excavation & Potholing
5 out of 5 stars
Called on a Friday, got a jetter on-site Saturday morning. Cleared roots we'd been fighting for months and gave us camera footage so the HOA stopped arguing.
David
Facilities Manager, Universal City
Sewer Jetting

Universal City FAQ

Questions we hear from Universal City customers

How do I request a quote for a Universal City project?

Send your Universal City site address, scope (footage, pipe size, access points), plans or photos and a requested completion date. Call (737) 618-0219, email info@cscundergroundservices.com, or use the quote form on this site - most quotes go out the same business day.

Do you charge a travel or trip fee to Universal City?

No standard trip fee for scheduled Universal City and Bexar County work on a normal route. Rush, after-hours or remote-access mobilizations are quoted transparently up front so there are no surprises on the invoice.

Are you licensed, insured and NASSCO certified for work in Universal City?

Yes - CSC Pipe Inspection is fully licensed, insured and NASSCO certified. Certificates of insurance naming your GC, owner or Universal City/Bexar County agency as additional insured are available on request before mobilization.

How soon can you be on-site in Universal City?

Most standard Universal City projects are scheduled within 1-3 business days. Same-day and after-hours response is available for active-site emergencies, flooded structures and construction-schedule urgencies - call and we'll dispatch the closest crew.

Do you handle both one-off and recurring work in Universal City?

Both. We take single-project calls (a stuck line, a pre-purchase inspection, a utility pothole) and we run scheduled recurring programs - monthly grease-line jetting, quarterly catch basin cleaning, annual storm-system CCTV - for Universal City property managers, HOAs, MUDs and facility teams.

Can you coordinate CCTV, jetting, vac-truck and locating on the same Universal City mobilization?

Yes - that's the point of running one crew. We routinely combine cleaning, camera inspection, hydro-excavation and private locating on the same Universal City visit so you get one schedule, one contact, one invoice and one accountable contractor.

Do you serve Universal City, TX?

Yes. Universal City is part of our regular service area - we're 75 miles away. Call (737) 618-0219 for a same-day quote.

What underground utility services are available in Universal City?

We offer all five core services in Universal City: CCTV pipeline inspection, hydro-excavation, pipe jetting, potholing and daylighting, and private line locating.

How fast can CSC reach a job in Universal City?

From our Cedar Park yard we're roughly 75 miles from Universal City, so a booked crew is typically on your Bexar County property the same day and within a two-hour arrival window. Emergency call-outs after mon - fri 7:00 am - 6:00 pm (after-hours available) are dispatched as soon as a truck is free.

Do you serve commercial sites near Pat Booker Road?

Yes - Pat Booker Road and the rest of Universal City are inside our daily service radius. We run inspection, hydro-excavation, and jetting trucks through Bexar County every week and know the utility layout, soil, and permit path for the area.

Will my Universal City report be accepted by municipalities and engineers?

Every Universal City sewer scope we deliver is a PACP-coded PDF plus the raw video, formatted the way engineering firms, public works reviewers, and Bexar County municipal desks expect. If a reviewer needs clarification on a defect code we'll get on the phone with them at no extra charge.

What does a typical CCTV inspection cost in Universal City?

Commercial sewer scopes in Universal City generally run in the same range as the rest of the Austin metro - we quote a flat price in writing before the truck leaves Cedar Park, based on line length, access, and whether you need PACP coding. Call (737) 618-0219 for a specific quote on your Bexar County address.

Acquiring or renovating in Universal City?

Get a pre-acquisition pipe inspection before you close on a Universal City commercial site.

A property condition assessment usually stops at the slab. Our pre-acquisition CCTV survey runs a color camera from the cleanout or manhole to the city tap so Universal City investors, property managers, and engineering firms know the true condition of the sanitary and storm lines before capital is committed. You get the video, a written PACP-coded defect log, and a repair scope you can price into the deal.

  • Scheduled dispatch that fits Universal City due-diligence and bid deadlines.
  • Reports formatted for lenders, insurers, and reviewing engineers.
  • Tenant-friendly: we coordinate access with property management and site staff.

Book your Universal City appointment

Get a free quote or schedule a site visit in Universal City

Tell us about the job and pick a day that works. A Universal City-area crew will confirm your appointment the same business day - or call (737) 618-0219 for immediate dispatch.

Free written estimates
Same-day confirmation
Licensed & insured crews

Best number for a same-day call back.

Where we send the video report and PACP-coded PDF.

Skip if you're not sure - we'll ask on the call.

Schedule an appointment (optional)

Prefer to talk now? Call (737) 618-0219. Same-day response, Mon - Fri 7:00 AM - 6:00 PM (after-hours available). We don't share your info.

Contact - Universal City, TX

CSC Pipe Inspection serving Universal City

BusinessCSC Pipe Inspection
HoursMon - Fri 7:00 AM - 6:00 PM (after-hours available)
Recommended reading for Universal City

Field guide: Hydro-Excavation in Central Texas

How hydro-excavation works, when it beats mechanical digging, and how to spec it right for local soil.

Read the guide →

Nearby cities we serve from Universal City

CSC crews dispatch from Cedar Park across the Austin 100-mile service radius. If you manage properties in more than one city, these are the Universal City-adjacent markets we most often run same-week CCTV inspection, hydro-excavation, and sewer jetting jobs in.

Call NowGet Quote