Williamson County

Weir Sewer Inspection & Hydro-Excavation

5.0· 3 verified Weir reviews

Weir is a small community just east of Georgetown where development growth is now meeting long-standing farm properties. We camera-verify new laterals, locate private lines on acreage and daylight utilities before the next round of road and utility widening.

Common Weir projects

  • New lateral verification for development builds
  • Acreage private line locating
  • Roadway-widening utility daylighting
  • Farm and irrigation line inspection

Neighborhoods we work in

County Road 152Highway 29 EastCircleville sideOld Weir

On-site in Weir

Services available in Weir

Every service below runs the same field-tested CSC process: locate, inspect on camera, document defects, and hand you a PACP-coded report before the crew leaves your Weir property.

CSC Pipe Inspection crew running a pipe inspection process on a Weir driveway

CCTV Pipeline Inspection in Weir

High-resolution camera inspection of sanitary sewer, storm drain and underground utility systems.

Delivered on-site across Weir and Williamson County with the same certified crew you'd get on any CSC cctv inspection job.

Commercial Vacuum Truck Services in Weir

Two commercial vacuum trucks removing water, mud, sediment, sludge and non-hazardous debris on active construction and infrastructure projects.

Available on emergency call-out when a Weir basin overtops after a storm.

Sewer & Storm Line Cleaning in Weir

High-pressure jetting to remove sediment, grease, roots, concrete residue and construction debris from sanitary sewer and storm drainage.

Delivered on-site across Weir and Williamson County with the same certified crew you'd get on any CSC line cleaning job.

Hydro Excavation & Potholing in Weir

Safely expose underground utilities using pressurized water and vacuum equipment - daylighting, potholing and utility test holes.

Delivered on-site across Weir and Williamson County with the same certified crew you'd get on any CSC hydro excavation job.

Utility Line Locating in Weir

Locate and mark underground sewer, water, electrical and communication infrastructure before excavation, drilling or construction begins.

Delivered on-site across Weir and Williamson County with the same certified crew you'd get on any CSC line locating job.

GCs, developers, property managers, and municipal crews in Weir rely on CSC for the full pipeline stack. cctv inspection in Weir, vac truck in Weir, line cleaning in Weir, hydro excavation in Weir, and line locating in Weir are dispatched from our Cedar Park yard, usually same-day within Williamson County County.

Why Weir calls CSC

Local differentiators - not a national script

  • Every camera run around County Road 152 is archived so you can hand the file to a contractor, engineer, or the next facilities manager without re-inspecting.
  • Direct line to the technician on your Weir job - the person coding the pipe is the person you call with questions.
  • Dispatched from our Cedar Park yard - trucks routinely reach Weir inside an hour of your call.
  • Same-day and after-hours availability for Weir property managers when a line backs up outside normal mon - fri 7:00 am - 6:00 pm (after-hours available).

How we work in Weir

A predictable process, on every Williamson County job

  1. 1

    CCTV inspection

    Calibrated crawler travels the full line, with a live monitor you can watch. Common Williamson County issues like new lateral verification for development builds get flagged in real time.

  2. 2

    PACP-coded report

    Every defect is coded to NASSCO PACP standards, mapped by footage from the cleanout, and delivered as a PDF plus the raw video - usually before we leave Weir.

  3. 3

    Repair recommendations

    We hand the file to your GC or engineer with a plain-English summary of what's normal wear for Weir commercial lines and what actually needs work.

  4. 4

    Hydro-excavation, if needed

    If a spot dig is warranted, our vacuum truck safely exposes the pipe without cracking utilities - critical near County Road 152 and any tree-root-heavy lot.

Recent work

Recent Weir, TX project photos

A snapshot of recent commercial jobs our Weir crews wrapped - real trucks, real crews, real deliverables.

Book your Weir project →
CSC Pipe Inspection technicians reviewing a PACP-coded sewer inspection report on a tablet at a Weir commercial job site near Old Weir
CCTV Pipeline Inspection

Same-day PACP report handoff in Weir

Sewer camera inspection reporting in Weir, TX - PACP-coded defect log and HD video delivered the same day.

Field review of a PACP-coded condition report with the superintendent on a Old Weir project. Defect log, footage marks, and HD video went to the GC before the crew left the site.

Site: Old Weir, Weir
Scope
Field report handoff
Equipment
Tablet review, footage marks
Crew
Lead PACP operator
Deliverable
Defect log + HD video before demob
See CCTV Pipeline Inspection details →
CSC Pipe Inspection hydro-excavation truck daylighting utilities on a Weir job site near County Road 152, operator in branded shirt at the boom
Hydro Excavation & Potholing

Hydro-excavation daylighting in Weir

Hydro excavation in Weir, TX - non-destructive potholing to daylight utilities before a directional bore.

Non-destructive potholing for a utility tie-in near County Road 152. Crew daylighted gas, water, and fiber before the GC's directional bore.

Site: County Road 152, Weir
Scope
6 potholes to 8 ft
Equipment
Vac truck, 3,000 PSI wand
Crew
2-person hydro crew
Deliverable
Marked depths + photo log
See Hydro Excavation & Potholing details →
CSC Pipe Inspection CCTV crawler monitor showing a defect inside a Weir sewer lateral, operator reviewing PACP-coded footage
CCTV Pipeline Inspection

CCTV sewer inspection in Weir

CCTV pipeline inspection in Weir, TX - NASSCO PACP-coded video and same-day condition report.

NASSCO PACP-coded video inspection of a 6-inch lateral in Highway 29 East. Delivered condition report with defect stationing the same day.

Site: Highway 29 East, Weir
Scope
6-inch lateral, 180 ft
Equipment
Self-leveling CCTV crawler
Crew
NASSCO PACP operator
Deliverable
Same-day PACP report + HD video
See CCTV Pipeline Inspection details →

Central Texas case studies

Sewer camera inspection case studies near Weir, TX

We have not published a Weir job yet, so these are the closest documented commercial inspections from our Central Texas service area. Each one is labeled with the city it was actually performed in. Same crews, same certifications, same reporting on your Weir site.

Sewer camera view inside new PVC pipe on a Cedar Park construction site showing gravel debris and a crushed section holding water before backfill
Before
Sewer camera view of the same Cedar Park new construction sewer run after repair and flushing, showing clean PVC at consistent grade
After
Cedar Park, TXGeneral contractorApril 2026

Pre-backfill scope caught crushed PVC on a Cedar Park build

Retail pad site, Cedar Park near Ranch at Brushy Creek · New Construction Sewer Verification

The problem

The site superintendent wanted underground verified before backfill and paving. The subcontractor had already pulled the trench boxes and was ready to bring in select fill the next morning, which would have buried anything wrong under a finished parking lot.

Our approach

  1. Scheduled the scope in the window between pipe installation and select fill, with trench boxes already pulled
  2. Ran every new sanitary run end to end, checking grade, deflection, joint seating, and cleanout elevations
  3. Flagged the crushed section on the spot so the site super could turn the sub around the same day
  4. Flushed the debris and re-scoped clean, then packaged the signed video for the City closeout submittal

What the camera found

  • Crushed section of 6-inch SDR-35 PVC at 74 ft where a loaded truck had tracked across an unshored trench
  • Gravel and mortar debris left in three runs, enough to catch solids at startup
  • One cleanout stubbed at the wrong elevation relative to the invert
  • Grade verified acceptable everywhere else on the run

Measurable results

  • Damage found while the trench was still open, so the fix was a same-day pipe swap instead of saw-cutting new asphalt
  • Debris flushed and re-scoped clean before the fill was placed
  • Signed-off video and report went into the closeout package the City accepted at final
Caught before
Backfill
Footage inspected
306 ft
Rework avoided
Asphalt cut
Schedule impact
None
Sewer camera inspection still from a Round Rock flex building showing a cracked and offset pipe joint flagged with PACP defect codes
Before
Re-inspection still of the same Round Rock sewer joint after spot repair, showing aligned pipe and a passing PACP condition rating
After
Round Rock, TXDeveloper / buyer due diligenceFebruary 2026

Pre-acquisition scope that repriced a Round Rock flex building

1980s flex industrial building, north Round Rock · Commercial Due Diligence Sewer Inspection

The problem

A buyer had 12 days left in the inspection period on a flex industrial building. The seller's disclosure said the underground was 'in service and functional.' The buyer's lender wanted a documented condition assessment on the sanitary and storm before funding.

Our approach

  1. Mobilized inside 48 hours of the buyer's call to fit the option period
  2. Inspected both the sanitary and the storm systems, structure to structure, on a single mobilization
  3. Graded every defect to PACP so the lender and the buyer's engineer had a common condition standard
  4. Issued the video, defect log, and a written scope of repair together so bids came back on the same basis

What the camera found

  • Cracked and offset joint at the property-line cleanout, coded as a Grade 4 structural defect
  • Two bellies in the sanitary run holding water, one deep enough to trap solids
  • Roof drain leader tied illegally into the sanitary line, a compliance exposure for the buyer
  • Storm line clear but silted, needing cleaning rather than replacement

Measurable results

  • PACP report and video delivered to the buyer's engineer inside 24 hours, in time for the option deadline
  • Buyer negotiated a repair credit against the purchase price using the coded defect grades as the basis
  • Scope of work for the spot repair and storm cleaning written straight off the defect log, so bids came back comparable
Footage inspected
412 ft
Turnaround
24 hours
Grade 4 defects
1
Closed on time
Yes
Sewer camera view of a collapsed clay pipe section under a Leander retail center with broken shards and soil blocking the flow path
Before
Sewer camera view of the same Leander sewer run after cured-in-place lining, showing a smooth seamless liner at full diameter
After
Leander, TXCommercial property managerFebruary 2026

Collapsed clay run under an occupied Leander retail center

Neighborhood retail center, Leander near US 183 · CCTV Pipeline Inspection & Locating

The problem

Two tenant suites had backed up three times in six weeks. The center stayed open through it, so any repair had to avoid trenching across the drive aisle during business hours. Nobody had a reliable as-built for the underground.

Our approach

  1. Worked from the closest access point to keep equipment off the drive aisle during business hours
  2. Camera-inspected to the collapse, then sonde-located depth and alignment and marked the real line on the pavement
  3. Documented that the remaining run was sound enough for lining, which put trenchless on the table
  4. Coordinated the after-hours rehab window and re-scoped the finished liner

What the camera found

  • Fully collapsed section of clay pipe with soil intrusion blocking most of the flow path at 96 ft
  • Root mass at two upstream joints feeding debris into the collapse
  • Line depth and alignment mapped by sonde, showing the run sat 2 ft off the assumed as-built
  • Remaining run structurally adequate for trenchless rehabilitation

Measurable results

  • Accurate depth and alignment let the rehab contractor plan a cured-in-place liner instead of open-cut across the drive aisle
  • Work staged after hours with no tenant closures and no lost parking during business hours
  • Post-lining scope confirmed a continuous, seamless liner at full diameter
Collapse located to
Within 1 ft
Repair method
Trenchless CIPP
Tenant closures
0
Drive aisle cut
Avoided
Companies we work with

Trusted by contractors serving Weir & Williamson County County

These are real GCs, sitework crews, and municipalities we work with across Central Texas - including project work near Weir.

  • Jimmy Evans Company logo - CSC Pipe Inspection partner
    Sitework Contractor
    Jimmy Evans Company
  • JL Gray Construction logo - CSC Pipe Inspection partner
    General Contractor
    JL Gray Construction
  • CLS Excavation Inc. logo - CSC Pipe Inspection partner
    Excavation
    CLS Excavation Inc.
  • Patin Construction logo - CSC Pipe Inspection partner
    Construction
    Patin Construction
  • City of Round Rock, TX logo - CSC Pipe Inspection partner
    Municipality
    City of Round Rock, TX
  • City ofAustinTexas
    Municipality
    City of Austin, TX
  • City ofCedar ParkTexas
    Municipality
    City of Cedar Park, TX
  • City ofGeorgetownTexas
    Municipality
    City of Georgetown, TX
  • City ofLeanderTexas
    Municipality
    City of Leander, TX
  • City ofPflugervilleTexas
    Municipality
    City of Pflugerville, TX
  • City ofHuttoTexas
    Municipality
    City of Hutto, TX
  • City ofKyleTexas
    Municipality
    City of Kyle, TX
  • City ofSan MarcosTexas
    Municipality
    City of San Marcos, TX

Verified Weir customer reviews

Rated 5.0 / 5 by Weir GCs, property managers, and public works crews

5.0 average · 3 verified Weir reviews

First-party feedback from recent Weir-area jobs. Names shortened for privacy; ratings reflect verified customer responses.

5 out of 5 stars
Showed up when they said they would, ran the camera the whole line, and sent us the video the same afternoon. Made the Weir permit walk-through painless.
Michael
General Contractor, Weir
CCTV Pipeline Inspection
5 out of 5 stars
We had a shallow gas line right where we needed to set piers. Their hydro crew potholed four spots in Weir without a single hit. Worth every dollar.
Sarah
Project Manager, Weir
Hydro-Excavation & Potholing
5 out of 5 stars
Called on a Friday, got a jetter on-site Saturday morning. Cleared roots we'd been fighting for months and gave us camera footage so the HOA stopped arguing.
David
Facilities Manager, Weir
Sewer Jetting

Weir FAQ

Questions we hear from Weir customers

How do I request a quote for a Weir project?

Send your Weir site address, scope (footage, pipe size, access points), plans or photos and a requested completion date. Call (737) 618-0219, email info@cscundergroundservices.com, or use the quote form on this site - most quotes go out the same business day.

Do you charge a travel or trip fee to Weir?

No standard trip fee for scheduled Weir and Williamson County work on a normal route. Rush, after-hours or remote-access mobilizations are quoted transparently up front so there are no surprises on the invoice.

Are you licensed, insured and NASSCO certified for work in Weir?

Yes - CSC Pipe Inspection is fully licensed, insured and NASSCO certified. Certificates of insurance naming your GC, owner or Weir/Williamson County agency as additional insured are available on request before mobilization.

How soon can you be on-site in Weir?

Most standard Weir projects are scheduled within 1-3 business days. Same-day and after-hours response is available for active-site emergencies, flooded structures and construction-schedule urgencies - call and we'll dispatch the closest crew.

Do you handle both one-off and recurring work in Weir?

Both. We take single-project calls (a stuck line, a pre-purchase inspection, a utility pothole) and we run scheduled recurring programs - monthly grease-line jetting, quarterly catch basin cleaning, annual storm-system CCTV - for Weir property managers, HOAs, MUDs and facility teams.

Can you coordinate CCTV, jetting, vac-truck and locating on the same Weir mobilization?

Yes - that's the point of running one crew. We routinely combine cleaning, camera inspection, hydro-excavation and private locating on the same Weir visit so you get one schedule, one contact, one invoice and one accountable contractor.

Do you serve Weir, TX?

Yes. Weir is part of our regular service area - we're 32 miles away. Call (737) 618-0219 for a same-day quote.

What underground utility services are available in Weir?

We offer all five core services in Weir: CCTV pipeline inspection, hydro-excavation, pipe jetting, potholing and daylighting, and private line locating.

Can you coordinate with my GC or engineering firm on a Weir job?

Yes, and we prefer to. In Weir we frequently run inspection ahead of a GC's repair or a developer's dig so everyone works from the same PACP-coded file. We don't sell the repair, so there's no conflict about what the video shows.

Do you handle commercial and municipal work in Williamson County?

We do - lift stations, wet wells, storm drains, grease traps, and pre-construction utility verification on commercial and public sites across Williamson County. COIs are issued to your GC or facilities team the same day you book.

How fast can CSC reach a job in Weir?

From our Cedar Park yard we're roughly 32 miles from Weir, so a booked crew is typically on your Williamson County property the same day and within a two-hour arrival window. Emergency call-outs after mon - fri 7:00 am - 6:00 pm (after-hours available) are dispatched as soon as a truck is free.

Do you serve commercial sites near County Road 152?

Yes - County Road 152 and the rest of Weir are inside our daily service radius. We run inspection, hydro-excavation, and jetting trucks through Williamson County every week and know the utility layout, soil, and permit path for the area.

Acquiring or renovating in Weir?

Get a pre-acquisition pipe inspection before you close on a Weir commercial site.

A property condition assessment usually stops at the slab. Our pre-acquisition CCTV survey runs a color camera from the cleanout or manhole to the city tap so Weir investors, property managers, and engineering firms know the true condition of the sanitary and storm lines before capital is committed. You get the video, a written PACP-coded defect log, and a repair scope you can price into the deal.

  • Scheduled dispatch that fits Weir due-diligence and bid deadlines.
  • Reports formatted for lenders, insurers, and reviewing engineers.
  • Tenant-friendly: we coordinate access with property management and site staff.

Book your Weir appointment

Get a free quote or schedule a site visit in Weir

Tell us about the job and pick a day that works. A Weir-area crew will confirm your appointment the same business day - or call (737) 618-0219 for immediate dispatch.

Free written estimates
Same-day confirmation
Licensed & insured crews

Best number for a same-day call back.

Where we send the video report and PACP-coded PDF.

Skip if you're not sure - we'll ask on the call.

Schedule an appointment (optional)

Prefer to talk now? Call (737) 618-0219. Same-day response, Mon - Fri 7:00 AM - 6:00 PM (after-hours available). We don't share your info.

Contact - Weir, TX

CSC Pipe Inspection serving Weir

BusinessCSC Pipe Inspection
HoursMon - Fri 7:00 AM - 6:00 PM (after-hours available)
Recommended reading for Weir

Field guide: Hydro-Excavation in Central Texas

How hydro-excavation works, when it beats mechanical digging, and how to spec it right for local soil.

Read the guide →

Nearby cities we serve from Weir

CSC crews dispatch from Cedar Park across the Austin 100-mile service radius. If you manage properties in more than one city, these are the Weir-adjacent markets we most often run same-week CCTV inspection, hydro-excavation, and sewer jetting jobs in.

Call NowGet Quote